Your browser doesn't support javascript.
loading
Show: 20 | 50 | 100
Results 1 - 2 de 2
Filter
Add filters








Language
Year range
1.
Einstein (Säo Paulo) ; 16(4): eGS4200, 2018. tab, graf
Article in English | LILACS | ID: biblio-975103

ABSTRACT

ABSTRACT Objective To verify the impact of the Lean Six Sigma methodology in reducing incorrect entries of non-appropriated revenues and expenses. Methods Process for the review and application of the Lean Six Sigma methodology between December 2015 and September 2016, in a high-complexity general hospital in the city of São Paulo (SP). Results A total of 3,756,814 (100%) entries were audited between December 2015 and September 2016. The Sigma level evolved over the course of the process and increased from 3.44 Sigma in December 2015 to 5.92 Sigma in September 2016. Entries classified as non-appropriated revenues and expenses were brought down to 0% at the end of the study. Conclusion The use of the Lean Six Sigma methodology was efficient in reducing incorrect entries, calculating costs, ensuring compliance in rendering of accounts and accurately determining cost-outcome ratios.


RESUMO Objetivo Verificar o impacto da metodologia Lean Seis Sigma na redução de lançamentos incorretos de receitas e despesas não apropriadas. Métodos Processo de revisão e aplicação de metodologia Lean Seis Sigma, no período de dezembro de 2015 e setembro de 2016, em um hospital geral de alta complexidade da cidade de São Paulo (SP). Resultados Foram auditados 3.756.814 (100%) lançamentos durante os meses de dezembro de 2015 e setembro de 2016. O nível Sigma foi demonstrado na evolução do processo e aumentou de 3,44 Sigma, em dezembro de 2015, para 5,92 Sigma, em setembro de 2016. Os lançamentos classificados como receitas e despesas não apropriadas chegaram a 0% ao término do estudo. Conclusão O uso da metodologia Lean Seis Sigma foi eficiente na redução de lançamentos incorretos, na apuração correta de custos, na garantia de compliance na prestação de contas e na acurácia no projeto de custos e desfechos.


Subject(s)
Humans , Total Quality Management/methods , Efficiency, Organizational/standards , Quality Improvement/organization & administration , Hospitals, Public/organization & administration , Quality Improvement/standards , Hospitals, Public/standards
2.
Einstein (Säo Paulo) ; 10(4): 480-490, Oct.-Dec. 2012. ilus, tab
Article in English | LILACS | ID: lil-662475

ABSTRACT

OBJECTIVE: Introduce a program for the management of scientific research in a General Hospital employing the business management tools Lean Six Sigma and PMBOK for project management in this area. METHODS: The Lean Six Sigma methodology was used to improve the management of the institution's scientific research through a specific tool (DMAIC) for identification, implementation and posterior analysis based on PMBOK practices of the solutions found. RESULTS: We present our solutions for the management of institutional research projects at the Sociedade Beneficente Israelita Brasileira Albert Einstein. The solutions were classified into four headings: people, processes, systems and organizational culture. A preliminary analysis of these solutions showed them to be completely or partially compliant to the processes described in the PMBOK Guide. CONCLUSION: In this post facto study, we verified that the solutions drawn from a project using Lean Six Sigma methodology and based on PMBOK enabled the improvement of our processes dealing with the management of scientific research carried out in the institution and constitutes a model to contribute to the search of innovative science management solutions by other institutions dealing with scientific research in Brazil.


OBJETIVO: Implementar um programa de gestão da pesquisa científica em um hospital geral aplicando as ferramentas de gestão empresarial Lean Seis Sigma e PMBOK no gerenciamento de projetos nessa área. MÉTODOS: Foi utilizada a metodologia Lean Seis Sigma para melhoria do processo de gestão da pesquisa científica institucional por meio de ferramenta específica (DMAIC) para identificação, implementação e posterior análise das soluções encontradas, tendo como base as boas práticas descritas no PMBOK. RESULTADOS: São apresentadas as soluções implementadas na Sociedade Beneficente Israelita Brasileira Albert Einstein para o gerenciamento dos projetos de pesquisa institucionais. As soluções foram categorizadas em quatro instâncias: pessoas, processos, sistema e cultura organizacional. Uma análise preliminar das soluções implementadas mostra que essas são, total ou parcialmente, aderentes às preconizadas no Guia PMBOK. CONCLUSÃO: Neste estudo de caso post facto, verificou-se que as soluções implementadas a partir do projeto Lean Seis Sigma e baseadas no PMBOK permitiram a melhoria de processo da gestão da pesquisa científica institucional, constituindo um modelo que pretende contribuir com a busca de soluções inovadoras na gestão da pesquisa pelas diferentes instituições com atividade científica no Brasil.


Subject(s)
Humans , Biomedical Research/organization & administration , Cost-Benefit Analysis/economics , Program Development/standards , Quality Improvement , Biomedical Research/economics , Efficiency, Organizational , Organizational Case Studies , Program Development/economics , Program Development/methods , Task Performance and Analysis
SELECTION OF CITATIONS
SEARCH DETAIL